Qatar
Hydro presents the entire value chain when producing aluminium. From refining bauxite and generating its own electrical power, to producing primary aluminium and manufacturing products such as casthouse products, building systems, extrusions, rolled products, and automotive and transport.
 |
| Construction works at Qatalum plant site |
In Qatar, Hydro is present as part-owner in an aluminium production plant, which is currently under construction.
In July 2007, the 50/50 joint venture owners Hydro and Qatar Petroleum approved construction of a primary aluminium plant – Qatalum - in Mesaieed.
Qatalum, with annual capacity of 585,000 tonnes, will be the largest primary aluminium plant ever built in one phase. It will be a fully-integrated plant consisting of a smelter, casthouse and carbon plant as well as a dedicated gas-fired power plant.
Qatalum is expected to begin production in late 2009 and reach full capacity in 2010.
Contact us
Qatar Aluminium ltd.
P.O. Box 23086
8th floor, Al Wakra Tower
Al Mynah Road, Old Slata
Doha
Qatar
Tel : +974 4413136/7/8
Faks: +974 4435187
Visitor's information
Qatalum plant site is in Mesaieed.
For information about casthouse products, please contact our Asia and Oceania sales office in Singapore.