A precision-extruded aluminum framing system manufactured by Hydro has been installed at a 500-kilowatt electric generation facility in Durango, Mexico, the largest concentrated photovoltaic (CPV) solar facility in Latin America. Located about 550 miles north of Mexico City, the Durango site is already designated to expand to 10 megawatts total capacity in the near future.