During the hearing, the independent engineering consultancy Rambøll also confirmed Alunorte’s ability to resume safe operations. Rambøll was hired on behalf of Ministerio Publico to conduct a third-party assessment of two independent reports from state environmental agency SEMAS and the Federal University of Campina Grande. Both of these independent reports have concluded that Alunorte can resume safe operations.
The matter of lifting Alunorte’s production embargos is now with the Federal Court for decision. The embargos on production and the use of the newly developed bauxite solid residue deposit area (DRS2) remains in force, and the timing of resuming normal operations remains uncertain.
Alunorte is duly delivering on the commitments agreed in the technical agreement (TAC) signed with Ministério Público (state and federal) and the State Government of Pará, represented by SEMAS.
Internal and external reviews, including inspections from authorities, confirmed that there was no overflow from Alunorte’s bauxite residue deposits or harmful spills from the February 2018 rainfall.
Published: April 12, 2019